Frequently Asked Questions
1. What are the available payment terms?
Normally, a 30% deposit in advance is required. Terms can be discussed further as our business relationship develops.
2. What is the standard lead time for delivery?
With a high production capacity of 200,000 pcs per month, our standard delivery time is typically around 15 days.
3. Can I request product samples for quality testing?
Yes, we are pleased to provide free samples for quality verification and performance checking.
4. What is the maximum switching current for the ERM601B?
The relay supports a switching capability of 60A/80A, with a maximum anti-load switching current of up to 120A.
5. Does this relay support both single and double coil configurations?
Yes, the ERM601B offers both single coil and double coil options to meet different application requirements.
6. Is the product environmentally compliant?
Yes, the relay is fully RoHS compliant, meeting international environmental and safety standards.